Steel plant energy use and peak demand
Find when a steel plant uses the most power and what drives it, and forecast the day ahead.
The brief
Electricity is one of the largest costs in steel making, and a tariff charges more for peaks. Analyse a year of energy readings from a steel plant, find what drives consumption and power factor, and forecast the next day's use so loads can be shifted. Good looks like: a clear breakdown by hour, load type and day, a forecast better than a simple repeat of yesterday, and an estimate of the saving from shifting load.
What you will build
- Load and clean the energy readings
- Break down use by hour, day and load type
- Study power factor and its penalty
- Forecast the next day with a simple model
- Estimate the saving from load shifting
- Present to a plant energy manager